CTS completed a design study for the Idaho Transportation Department (ITD) and the City of Driggs to improve about two miles of Main Street (a State Highway) through downtown Driggs. The current right-of-way is 99-feet wide, but has very little curb, gutter or sidewalk.
The purpose of the project was to enhance the movement and safety of non-motorized traffic, while continuing to provide for the efficient movement of vehicular “through” traffic on the state highway.